BINTAN 200MWAI Data Center
Power640 MW captive

640MW on site. Phase 1 uses 39% of it.

The plant is built, the feeders are dedicated, and nobody has to approve a new substation before we can switch on.

POWER PATH · Plant → SS → spine → halls

640MWInstalled
$0.088/kWhDelivered
1.8%Loss plant→rack
99.99%Availability
Generation

80 × 2.5 MW

N+1. Hot-swap without dropping load. Dual-route 220 kV switchyard.

Conversion

800 V DC

SiC solid-state transformers, 98.2% efficiency. Busway overhead, maintainable taps.

Buffer

20 MW / 40 MWh

LiFePO4 ride-through plus 48 h fuel below grade.