Built for 136kW. Piped for 600kW.
A 10 to 20 kW room cannot host a 40 kW accelerator rack. The hall is sized, piped and powered for density that grows past GB300.
136kWPer rack today
72GPUs / rack
600kWPipe reserved
45°CSupply
Validated before arrival
Factory and site acceptance, burn-in, warm handover. DSX reference architecture and Tier III concurrent maintainability.
Path forward
H200 → GB300 → Rubin VR200 → Kyber. One building envelope, reserved pipe capacity.